Civil procedure rules
[edit] Introduction
The civil procedure rules (CPR) constitute a procedural code governing civil litigation and helping courts deal with civil cases justly. Introduced by the Civil Procedure Act 1997, they came into force in 1999 and are used by the Court of Appeal, High Court of Justice and County Courts in England and Wales.
There are also criminal procedure rules and family procedure rules.
CPR replaced the old rules of the Supreme Court and County Court Rules, and sought to improve access to justice by speeding up the process and lowering the cost of legal proceedings, as well as making them easier for laypeople to understand.
They are divided into 74 parts, each of which has several rules, along with practice directions that apply to each part.
According to Part 1 Rule 1, the court’s overriding objective is to deal with cases justly; in other words, preserving equality of the disputing parties and ensuring the case is handled fairly. An obligation is imposed on the parties to help the court in this objective.
Civil cases can be heard in one of the following courts:
[edit] Small claims track
This is for claims with a value of not more than £10,000. Small claims hearings are informal and the strict evidence rules do not apply. People may issue claims for a variety of reasons, including:
- Poor workmanship.
- Personal injury.
- Non-supply of goods.
- Damage to property.
- Disputes between landlords and tenants.
[edit] Fast track
This is for claims with a value of between £10,000-£25,000, and which can be disposed of by a trial which will not take longer than one day. Cases allocated to the fast track typically include claims such as those by tenants for orders requiring their landlord to carry out repairs or other work to the premises.
[edit] Multi track
This is for claims with a value of more than £25,000. Cases can also be allocated where the value may be less but they involve complex points of law and/or evidence.
[edit] Proceedings
A claim form is issued on the defendant by the court on the request of the claimant to start proceedings. A statement of the claim must be contained within the claim form, as well as the particulars of the claim, and the remedy sought, whether for money or otherwise. The claim form must be served on the defendant within 4 months of the issue arising (this can extend to 6 months if the service is to a foreign jurisdiction).
The defendant can respond, within 14 days after service of the particulars of the claims form, in one of the following ways:
- File an acknowledgement of service.
- File or serve an admission.
- File a defence.
If the defendant fails to respond in one of these ways, then they will be subject to a Judgment in Default.
If the defendant files acknowledgement of service, the defendant must state which allegations are admitted, which they are unable to admit, and which they deny. A statement of truth must verify the defence. In accordance with CPR Part 20, a defendant can also issue a counterclaim.
The court starts active management of the case as soon the defence is filed.
[edit] Pre-action protocols
Pre-action protocols are included in the annexes of the CPR and explain the conduct and set out the steps parties should take before commencing proceedings of civil claims.
The aim of pre-action protocols is to encourage early dispute settlement without needing the court’s involvement, thereby saving time and money for both the defendant and claimant. By encouraging early exchange of information, the parties can understand more clearly the implications of the dispute. The court will expect parties to have exchanged information sufficient for the following conditions to have been achieved:
- An understanding of each other’s position.
- Decisions made about how to proceed.
- Attempts made to settle without proceedings.
- Consideration of a form of Alternative Dispute Resolution (ADR).
- Reduce the costs of resolving the dispute.
Pre-action protocols specific to the built environment include:
[edit] Construction and engineering disputes
This protocol applies to all construction and engineering disputes (including professional negligence claims against architects, engineers and quantity surveyors).
[edit] Housing disrepair cases
This protocol applies to residential property and relates to claims by tenants and others in respect of housing disrepair. The tenants must ensure that the landlord is aware of the disrepair before using the protocol, as it is only intended for cases where the matter remains unresolved.
The aim of the protocol is to promote the quick and appropriate carrying out of repairs which are the landlord’s responsibility, and ensure tenants receive any entitled compensation.
[edit] Possession claims based on mortgage or home purchase plan arrears in respect of residential property
Under CPR, ‘possession claim’ means a claim for the recovery of possession of property. ‘Home purchase plan’ refers to a method of purchasing a property by way of a sale and lease arrangement that does not require the payment of interest.
The aim of the protocol is to ensure lenders and borrowers act fairly and reasonably in resolving any mortgage or home purchase plan arrears dispute.
[edit] Possession claims by social landlords
This protocol applies to residential possession claims by social landlords and private registered providers of social housing. This can relate to claims for rent arrears, or where the court’s discretion to postpone possession is limited by s89(1) Housing Act 1980.
[edit] Claims for damages in relation to the physical state of commercial property at termination of a tenancy
Otherwise known as the 'Dilapidations Protocol', this applies to claims for damages for dilapidations against tenants of commercial property. ‘Dilapidations’, ‘repair’ and ‘redecoration’ are not defined by the protocol, as work that may be required will be held to depend on the lease’s contractual terms.
[edit] Related articles on Designing Buildings Wiki
- Alternative dispute resolution.
- Breach of contract.
- Causes of construction disputes.
- Common law.
- Construction litigation.
- Contract claims.
- Dilapidations protocol.
- Expert determination.
- Expert witness.
- Joint and several liability.
- Lands Chamber.
- Liquidated damages.
- Loss and expense.
- Notice.
- Preliminaries.
- Technology and Construction Court.
[edit] External resources
- InBrief - Civil procedure rules
- Justice.gov - Civil
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Building Safety Wiki Interviews
Chief executive of the British Woodworking Federation.
Planning condition discharge in England and Wales
A brief exoplanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.